沿空掘巷煤柱宽度优化的数值模拟研究
Numerical simulation study on coal pillar size optimization of roadway driving along gob
-
摘要: 随着锚杆支护技术的推广应用,传统采掘体系中为回采工作面留设大煤柱的做法,正在越来越多的被小煤柱沿空掘巷所取代。本文运用FLAC数值模拟方法,对三交河煤矿采空区上下倾斜方向上煤层上方的支承压力分布状态,以及采动压力影响下相同锚杆支护方式的不同宽度煤柱沿空掘巷的围岩变形状况进行了模拟,得出了优化的沿空掘巷煤柱尺寸范围在4~6m。Abstract: With the innovation and popularization of bolting support technology, the manner of long-pillar working in the traditional system of winning and opening for working faces is being placed by small roadway driving along gob. By FLAC simulation, the bearing pressure distribution above the coal bed and the deformation of wall rock surrounding the roadway driving along gob of different size pillar under the influence of mining pressure and same way of bolting support are simulated in this paper, as a result the range of optimizing pillar size is obtained which is 4~6m.