玉溪大红山矿业有限公司带式输送机提速扩能改造研究
投稿时间:2018-09-26  修订日期:2018-09-26  点此下载全文
引用本文:
摘要点击次数: 177
全文下载次数: 23
作者单位E-mail
李飞 玉溪大红山矿业有限公司 13932368226@163.com 
中文摘要:根据大红山铁矿400万t/a一期采矿工程及二期采矿工程的系统提升能力,认为一期采矿工程采2#胶带机的提升能力不足。为实现一期、二期胶带提升系统能力匹配,满足原矿供矿需求,并考虑到现存的问题,提出了改造扩能方案。根据采2#胶带机系统配套的具体情况对胶带机系统进行了设计计算及选型。
中文关键词:带式输送机  扩能改造  大红山铁矿
 
Study on Speed expansion and Reconstruction of Belt conveyor inYuxi Dahongshan Mining Co., Ltd.
Abstract:According to the system lifting ability of the 4 Mt/a mining project and the second stage mining project of Dayongshan iron mine, it is considered that the lifting capacity of the belt conveyor in the first stage mining project is insufficient. In order to realize the capacity matching of the first and second stage belt hoisting system and satisfy the ore supply demand of the original mine, and considering the existing problems, the transformation and expansion scheme is put forward. According to the concrete conditions of belt machine system, the design calculation and selection of belt machine system are carried out.
keywords:band conveyo  capacity expansion transformation  Dayongshan iron mine