导高不确定条件下涌水量计算模型确定方法

    Calculation of water inflow under uncertain leading conditions model determination method

    • 摘要: 高家堡煤矿4煤层顶板分布多个含水层,其中洛河组含水层富水性强且洛河组上下段无明显隔水层,并且导水裂缝带高度也难以观测,所以涌水量计算模型的确定至关重要。根据洛河组的出水水源分析,建立了分段进水非完整井模型,井壁进水非完整井模型和越流模型。采用三种模型对104工作面涌水量进行预测计算并绘制涌水量曲线图。通过与104工作面实测涌水量曲线图对比,确定了分段进水非完整井模型最为合适。通过已采工作面的实测涌水量进行验证,证明该模型是可靠的,对今后矿井涌水量的计算具有借鉴意义。

       

      Abstract: Multiple aquifers, specially the Luohe formation aquifer with good water yield property are overlying the No.4 coal seam in Gaojiapu coal mine, there is no obvious aquifer in the upper and lower sections of the Luohe formation, and it is difficult to observe height of water conducting fractured zone, so the determination of the water inflow calculation model is crucial.According to the water output data of Gaojiapu coal mine, in the case of high conductivity uncertainty of the Luohe formation aquifer, analyzing partially penetrating well model for water inflow into the shaft wall under two conditions and overflow model by comparing with the actual water inflow from the mine, it is determined that the partially penetrating well model of segmented water is most suitable.The model is proved to be reliable by verifying the measured water inflow of worked surfaces.It can be used for reference to the calculation of mine water inflow in the future.

       

    /

    返回文章
    返回