穿脉数据约束下的金属矿体三维建模

    3D modeling of metal ore body constrained by transverse drift data

    • 摘要: 针对金属矿山三维建模过程中数据量较小,难以精确还原矿体表面模型的问题,提出了一种穿脉数据约束下的三维矿体表面建模方法。通过分析钻孔数据缺失矿体的数据特征,以矿山工程图中穿脉图与矿体轮廓图为源数据,利用穿脉数据对矿体轮廓线进行约束;在讨论穿脉数据与矿体轮廓线匹配问题的基础上,提出了以穿脉上见矿点与矿体轮廓线的连接方法以及穿脉数据约束矿体表面建模的约束算法。以内蒙古油篓沟矿区为研究对象进行建模。研究结果表明:在穿脉数据约束下的矿体三维建模可以更好地模拟矿体表面形态、提高建模精度,矿体建模插值后的计算结果与生产详查报告进行的储量估算的储量值相差不大,结果较为准确。因此该算法有利于提高矿体储量估算的精度。

       

      Abstract: Aiming at the problem that it is difficult to accurately restore the surface model of ore body due to the small amount of data in three-dimensional modeling of metal mines, a three-dimensional surface modeling method constrained by transverse drift data is proposed.Based on the analysis of data characteristics of missing orebodies from borehole data, the transverse drift map and orebody contour map in mine engineering drawings are taken as source data, and the transverse drift data are used to constrain the orebody contour line.On the basis of discussing the matching problem between transverse drift data and orebody contour line, the method of connecting the transverse drift point with the contour line and the constraint algorithm of the transverse drift data to constrain the orebody surface modeling are.Taking Inner Mongolia Youlougou mining area as the research object, the model is built.The results show that the three-dimensional modeling of orebody constrained by transverse drift data can better simulate the orebody surface morphology and improve the modeling accuracy, and the estimated reserves reach 2 384.39 kg.The reserves estimated by production detailed survey report are not different from those calculated by the interpolation of orebody modeling, and the results are more accurate.Therefore, this modeling method is conducive to further accurate estimation of orebody reserves.

       

    /

    返回文章
    返回