常兴煤矿3107工作面充填复采经济可行性分析

    Economic feasibility analysis of filling repeated mining of 3107 working face in Changxing coal mine

    • 摘要: 基于条带开采的常兴煤矿,采空区遗留了大量条带煤柱,严重浪费了煤炭资源,经过长时间的蠕变可能诱发矿震,造成更大的损失。对此,矿方将进行采空区条带煤柱充填复采,但充填复采面临巨大的成本问题和投资风险。基于此,本文对常兴煤矿3107工作面充填复采的投资成本进行分析,用净现金流量法评价该项目的经济可行性,分析了净现值、内部收益率对各影响因素敏感性。结果表明:该项目经济效益良好,抗风险能力较强,项目可以实施。

       

      Abstract: Based on the strip mining, Changxing coal mine has left a large number of strip coal pillars in the goaf, which seriously wastes coal resources.After a long period of creep, mineral shocks may be induced, which will cause greater losses.In this regard, the mining will recover the strip coal pillar in the goaf by filling, but the filling will face huge cost problems and investment risks.This paper analyzes the investment cost of filling and re-harvesting of 3107 working face in Changxing coal mine.The cash flow method is used to evaluate the economic feasibility of the project and analyze the sensitivity of the net present value and internal rate to each influencing factor.The results show that the project has good economic benefits, strong anti-risk ability, and could be implemented in Changxing coal mine.

       

    /

    返回文章
    返回