基于UAV勘察与层次分析法的安阳许家沟露天矿山地质风险评价

    Geological risk evaluation of open-pit mines of Xujiagou in Anyang based on UAV survey and analytic hierarchy process

    • 摘要: 矿产资源是社会经济发展的重要基础,在社会发展与生态建设统筹的背景下,矿山地质风险防治与生态环境修复成为矿业研究的焦点。矿山地质风险的分类和量化是矿山地质风险防治和修复的基础,有利于因地制宜制定治理措施。本文基于UAV勘察和层次分析法对安阳许家沟露天矿山群地质风险进行了评价,根据勘察结果总结出边坡崩塌、矿坑坍塌和水土流失3个主要地质风险,各风险层选取4个因素,共12个评价指标,并利用ArcGIS栅格计算模块对选取的12个评价因素进行叠加分析。研究结果显示:高度风险区、显著风险区、一般风险区和稍有风险区的面积分别为13 500 m2、39 000 m2、26 750 m2、45 750 m2,分别占研究区总面积的10.8%、31.2%、21.4%、36.6%;综合矿山地质风险排序为河西胜利II区<豫隆I区<豫安III区;从豫隆I区到豫安III区,随着研究子区面积的减少,边坡崩塌风险贡献率逐渐降低,矿坑坍塌风险和水土流失风险逐渐升高。研究结果表明,边坡崩塌评分与矿山地质评分呈现双峰态势,而矿坑坍塌风险和水土流失风险呈单峰态势。本文提出危岩清除、矿渣回填、边坡修整、客土恢复林地和耕地、养护治理等治理措施,从而降低矿山地质风险,修复矿山生态。

       

      Abstract: Mineral resources are an important foundation for social and economic development, and in the context of integrating social development and ecological construction, prevention, control and ecological environment restoration of mine geological risks have become the focus of mining research. The classification and quantification of mine geological risk is the basis of prevention and restoration, which is conducive to the development of management measures according to local conditions. This paper evaluates the geological risk of open-pit mines group of Xujiagou in Anyang based on UAV survey and analytic hierarchy process, and summarizes three main geological risks of slope failure, pit collapse and soil erosion according to the survey results, and selects four factors for each risk layer, with a total of 12 evaluation indexes, and utilizes ArcGIS raster computation module to superimpose and analyze the 12 evaluation factors selected in this study. The results show that the areas of high risk zone, significant risk zone, general risk zone and slight risk zone are 13 500 m2, 39 000 m2, 26 750 m2 and 45 750 m2 respectively, accounting for 10.8%, 31.2%, 21.4% and 36.6% of the total area of the study area; the comprehensive mine geological risk is ranked as Hexi Shengli Zone II<Yulong Zone I<Yu’an Zone III. From Yulong Zone I to Yu’an Zone III, as the area of the study sub-area decreases, the contribution rate of slope failure risk gradually decreases, and the risk of pit collapse and soil erosion gradually increases. The results show that the slope failure score and mine geology score show a bimodal trend, while the pit collapse and soil erosion risks show a single peak. This paper proposes management measures such as dangerous rock removal, slag backfilling, slope trimming, guest soil restoration of forested and cultivated land, and conservation management, so as to reduce the mine geological risk and repair the mine ecology.

       

    /

    返回文章
    返回