某高堆坝尾矿库动力响应及稳定性分析

    Dynamic response and stability analysis of a high tailings dam

    • 摘要: 通过选取两条实测地震波和一条规范谱拟合人工波,采用时程法开展了某高堆坝尾矿库的抗震动力分析,研究了三组不同地震波作用下尾矿库的加速度响应、液化区分布、地震永久变形、坝体动抗滑稳定情况。研究结果表明:地震作用下,该尾矿坝加速度最大值发生在初期坝顶及堆积坝顶、边坡区域,坝体未出现动力响应“鞭鞘效应”;坝体液化区主要出现在沉积滩浅层区域;震后坝体呈现整体震陷,震陷约占坝高的0.18%;坝体在不同地震波作用下,最小安全系数为1.51,均大于规范建议的最小安全系数。通过动力抗震计算分析说明尾矿库的安全满足规范要求,可为类似工程提供参考。

       

      Abstract: The dynamic seismic analysis of a high tailings dam is carried out using the time history method by selecting 2 measured seismic waves and 1 standard spectral fitting artificial seismic wave. The acceleration response, liquefaction zone distribution, earthquake permanent deformation, and dynamic stability of tailings pond under three different earthquake wave effects are studied. The research has shows that under earthquake action, the maximum acceleration of the tailings dam occurred at the initial dam crest, accumulation dam crest and slope area, and there is no dynamic response “whiplash effect” on the dam body. The liquefaction zone of the dam body mainly occurred in the shallow areas of sedimentary beaches. After the earthquake, the dam body showed overall seismic subsidence, accounting for approximately 0.18% of the dam height. The minimum safety factor of the dam under different earthquake waves is 1.51, which is greater than the minimum safety factor recommended by the specifications. Through dynamic seismic analysis, it is demonstrated that the safety of tailings ponds meets regulatory requirements, which can also provide reference for similar projects.

       

    /

    返回文章
    返回