多场耦合作用下泥砂渗溃性与工作面方位匹配关系研究

    Study on the matching relationship between permeability of mud and sand and working face orientation under multi-field coupling effects

    • 摘要: 针对工作面开采顶板突水溃砂发生位置难以预测的问题,以新上海一号煤矿为背景,采用岩石三轴测试系统,结合超声波监测,测试了采动和孔隙水压作用下岩石破坏规律,分析了加卸载路径和孔隙水压对岩体失稳的影响。在此基础上,采用颗粒流数值模拟,分析了工作面方位、采高与泥砂(劣化岩体)渗溃性的关系。结果表明,岩石偏应力与纵波波速变化趋于一致,岩石加轴压卸围压条件下较不等间距定围压抗压强度有所降低,孔隙水压的增大加剧了岩石的破坏;水压大小和裂隙尺寸影响泥砂(劣化岩体)的渗溃性,渗溃风险随采高增大、工作面方位前移而增大,也随水压增大而增大;现场实践中,应密切关注推进距离及主要含水层的水位变化,可采取提前预置导流管+扇形疏放水技术,控制顶板含水层安全水头,实现工作面安全回采。

       

      Abstract: Addressing the challenge of predicting the location of water and sand inrush from the roof during coal mining, this study, taking the New Shanghai No.1 Coal Mine as a backdrop, employs a rock triaxial testing system combined with ultrasonic monitoring. It tests the failure patterns of rocks under the influence of mining activities and pore water pressure, and analyzes the effects of loading and unloading paths as well as pore water pressure on rock mass instability. Based on this, particle flow numerical simulation is employed to analyze the relationship between the orientation of the working face, mining height, and the permeability of mud and sand(deteriorated rock mass). The results show that: the variation of rock deviatoric stress tends to be consistent with that of the longitudinal wave velocity. The compressive strength of rock under axial compression and unloading of confining pressure decreases compared to that under constant confining pressure with unequal spacing. The increase in pore water pressure exacerbates the damage to the rock. The magnitude of water pressure and the size of fractures affect the permeability of mud and sand(deteriorated rock mass). The risk of seepage increases with the increase of mining height, the forward movement of the working face orientation, and the increase of water pressure. In on-site practice, close attention should be paid to the advancement distance and changes in the water level of the main aquifer. The technology of pre-positioning diversion pipes and fan-shaped water drainage can be adopted to control the safe water head of the roof aquifer and achieve safe mining of the working face.

       

    /

    返回文章
    返回