露天矿分期开采采剥关系多目标动态优化方法

    MULTIOBJECTIVE DYNAMIC OPTIMIZATION OF RELATION BETWEEN MINING AND STRIPPING IN MULTISTAGE MINING OF OPEN-PIT MINES

    • 摘要: 本文应用多目标动态规划理论,提出了露天矿分期开来采剥关系多目标动态优化方法。该方法是露天矿分期开采来剥关系优化理论的进一步推广。

       

      Abstract: This paper applies the multiobjective dynamic programming theory to put forward a multiobjective dynamic optimization method of relation between mining and stripping in multistage mining of open-pit mines. This method is expansive one of the general dynamic optimization method in this mining method.

       

    /

    返回文章
    返回