论盘区矿柱对顶板导水裂缝带发育的影响

    INFLUENCE OF ARRANGED PANEL BARRIER ON THE DEVELOPMENT OF WATER-CONDUCTING FISSURE ZONE IN OVERLYING STRATA

    • 摘要: 数值模拟结果表明,用充填法开采水平、缓倾斜中厚矿体时,当采空区规模超过了一定范围后,留设盘区矿柱明显地减小了顶板围岩中导水裂缝带的最大发育高度,并且使得最大潜在导水裂缝的发育形态也发生了变化,这些结论对矿山的安全生产,具有重要的指导作用.

       

      Abstract: In this paper, a numerical simulation method is used to investigate the development of water-con-ducting fissure zone in overlying strata resulting from the extraction of horizontal or gently dippingmedium thickness orebody under water with back-filling. The results show that the maximum devel-oping height of actual presented zone decreases, and the developing shape of latent zone varies bymeans of being arranged panel barrier when the extracting 8cale develops to a certain extent. The con-clusions will play important role in guiding the mine safe production.

       

    /

    返回文章
    返回