采场结构参数优化的数值模拟研究

    The numerical simulation study of stope optimization of structural parameters

    • 摘要: 根据塘子凹矿段采区实际情况,借助于DIMINE软件三维可视化建模和FLAC-3D三维力学分析软件,通过采用三维有限元数值模拟计算方法,对塘子凹采场的3种结构参数和3种开采顺序等五种方案,进行了不同开采时期的优化分析和比较,分析计算了各种模拟方案的应力及位移变化规律,得到了采场的最佳结构参数。

       

      Abstract: In accordance with sub-Tong Au ore mining area above the actual situation, with the help of three-dimensional visual modeling in DIMINE software and FLAC-3D three-dimensional mechanical analysis software, after using the method of three-dimensional finite element’numerional simulation, Optimization analysis and comparision are made on the five schemes including three kinds of structure parameters and three kinds of mining sequence for the deep stope of sub-Tong Au in different mining periods, through the analysis of the various simulation programs of the stress and displacement changes, it obtains the best structural parameters of mine.

       

    /