Abstract:
In consideration with the practical conditions of the underground mined area in TAOCHONG,the possibility of caving in with the hanging wall and the potential damages are analyzed.A new technique about expanding the ceiling area of mined area and inducing the hanging wall to cave in itself is used.The technique is eventually proved successful as no accident happened during the caving in and the remnant ore in the mined area is recovered safely.
Hanging wall foot wal mined area property mined area underground the oreing.In combination with the pratical conditions of Taochong mine,the dangerous factors and degree have been analyzed.A new method of entrapping rockfall was put forward.The practice show that the method have better safty,and the iron ores have been fully mined in pratice.