本钢歪头山矿下盘排土场滑坡机理及高台阶排土合理参数

    MECHANISM OF SLOPE FAILURE OF FOOTWALL WASTE DUMP AND RATIONAL PAPAMETERS OF HIGH-BENCH WASTE DISPOSAL IN WAITOUSHAN IRON ORE MINE, BENXI IRON & STEEL CO

    • 摘要: 本文在歪头山矿下盘上场滑坡、排上工艺调查基础上,分析了排立场形成的三种滑坡模型。并对影响上场滑动的主要因素地形、表上、散体力学性质及台阶高度、推进速度等进行了分析和敏感度计算。根据综合分析,提出了排立场各台阶的合理高度及在考虑排立场稳定性,不影响排上场生产能力前题下,确定各排主线的有效长度。

       

      Abstract: On the basis of investigation on footwall waste dump's slope failure and waste disposal technology,this paper analyses three modes of slope failures of the waste dump;analyses the main factors effecting on waste dump's slope failure such as topography, surface soil, mechnical property of loose body, hight of bench,edvancing velocity etc,and makes their sensitivity calculating. Based on the comprehensive aalysis,the rational hights of waste dump's benches are presented;and the effective lengthes of all waste disposal fronts,in un-effecting on production capacity of waste dump,are determined.

       

    /