组合台阶工作帮与新水平准备工程的衔接
THE RELATIONS BETWEEN GROUPED BENCHES WORKING SLOPE AND NEW LEVEL PREPARATION OF OPEN PIT
-
摘要: 本文论述了组合台阶工作帮与新水平准备工程之间的衔接关系,阐明了平行衔接与顺序衔接两种方式的特点及相应的空间尺度确定方法。Abstract: This paper describes the relations between grouped benches working slope and new level preparation of open pit. The two relations are parallel relation and ordinal relation. Characteristics of the two relations and corresponding buffer width are also described.
下载: