地下煤矿采掘衔接计划系统的一种实现

    IMPLEMENTATION OF A PRODUCTION SCHEDULING SYSTEM FOR UNDERGROUND COAL MINES

    • 摘要: 简述了地下矿采掘计划数学模型及计算机方法研究中尚存的问题,给出了地下煤矿采掘衔接计划计算机辅助管理系统的一种设计方法及其实现技术,指出了提高地下矿生产计划计算机管理系统的应用性与实用性的途径。

       

      Abstract: This paper introduces the current problems existing in mathernatical and computeruaidedmethods for underground mine production scheduling, presents the implementing features of a computer-aided production scheduling system for underground coal mines, including the managernent of mine data bya data-base system, the generation of mine sequences by discrete-event slmulation and the adjustment ofmine sequences by interactive techniques, and proposes some suggestions on the operationality and applica-bility of computer-aided production scheduling systems for underground coal mines.

       

    /

    返回文章
    返回