乌拉特中旗毅腾矿业有限责任公司400万t/a选煤厂可行性研究
Feasibility study report of 4Mt/a coal prepare plant belonged to Tengchong mining Co.,Ltd.
-
摘要: 针对当前国内资源非常短缺的情况,毅腾矿业有限公司大力开拓进口蒙古国煤炭以满足国内需求。为此,毅腾公司将建设一条400万t的洗煤厂,并进行可行性研究。Abstract: In the face of resource shortage, Tengchong mining Co., Ltd enters on importing coal from Mongolia in order to satisfy the great domestic demand in coal. They will build another 4Mt/a coal prepare plant, and the feasibility study report was brought forward to.
下载: