Abstract:
According to needs of the the stripping technology in fifth period extension of Buzhaoba surface mine,advancing doable the stripping technology projects by analysing stripping actuality and mining conditions when fifth period extension is finished.It is that topsoil stripped adopts shovel and truck technology,and marl is stripped with integrated process which are discontinuous mining system,BWE continuous system and crusher semi-continuous system,later predigest the stripping system by canceling BWE continuous system.By comparision crushing facility of semi-continuous technology system,it is not only lower investment but also reduce production cost if movable crusher is used.