Abstract:
In order to choose the appropriate delay time of between holes and rows of Jinduicheng Openpit Mine so as to reduce the blasting vibration,the field tests with digital detonator are taken in platform 1224 and platform 1236 in the south Open-pit of Jinduicheng Mine.The delayed time was chosen as 9ms,25 ms,30ms and 42 ms between the holes and 60 ms,65ms,75 ms and 80 ms between the rows,compared with production blasting delay time with 25 ms between the holes and 65 ms between the rows.The SplitDesktop 3.0 software was used to analyze the blasting fragmentation.The results show that when the delay time is 30ms/75 ms,the blasting effect is the best,the damping rate is 38.4%.