杨村煤矿薄基岩区提高综放面开采上限试验研究

    Experimental research on improving upper mining limit of fully mechanized caving face in rhin bedrock in yangcun coal mine

    • 摘要: 通过采用钻孔注(放)水法探测了杨村煤矿综放面采后覆岩采动破坏高度;通过基岩柱厚度探测,探明305工作面浅部顶板基岩柱厚度;采用无线电波坑道透视,查明了工作面内的隐伏小断层及其延展情况。在此基础上,设计了305综放面安全防砂煤柱为30m,并制定了相应试采方案。通过试验取得了3煤综放面提高开采上限试采的成功。

       

      Abstract: The paper probed the roof destroyed altitude by pouring water into borehole method after the coal stratum exploited in fully mechanized sub-level caving face in view of the situation in Yangcun Coal Mine, Ascertained the lying concealed small faults in the working face and their extension condition by underground radio-wave penetration method, Proved the thickness on shallow bedrock roof of No.305 face; On this basis, Designed dimension of the sand-preventing coal pillars, lifted the upper mining limit to 30m, Worked out one testing scheme for fully mechanized sub-level caving face. Have got success of improving the upper mining limit in Fully-Mechanized Caving Face in No.3 coal seam by the experiment.

       

    /