苏铭, 姚强岭, 刘梓昌, 夏泽. 链臂锯切顶卸压小煤柱留巷开采围岩稳定性分析[J]. 中国矿业, 2021, 30(7): 146-151. DOI: 10.12075/j.issn.1004-4051.2021.07.014
    引用本文: 苏铭, 姚强岭, 刘梓昌, 夏泽. 链臂锯切顶卸压小煤柱留巷开采围岩稳定性分析[J]. 中国矿业, 2021, 30(7): 146-151. DOI: 10.12075/j.issn.1004-4051.2021.07.014
    SU Ming, YAO Qiangling, LIU Zichang, XIA Ze. Analysis on stability of surrounding rock in small coal pillar roadway with chain arm sawing[J]. CHINA MINING MAGAZINE, 2021, 30(7): 146-151. DOI: 10.12075/j.issn.1004-4051.2021.07.014
    Citation: SU Ming, YAO Qiangling, LIU Zichang, XIA Ze. Analysis on stability of surrounding rock in small coal pillar roadway with chain arm sawing[J]. CHINA MINING MAGAZINE, 2021, 30(7): 146-151. DOI: 10.12075/j.issn.1004-4051.2021.07.014

    链臂锯切顶卸压小煤柱留巷开采围岩稳定性分析

    Analysis on stability of surrounding rock in small coal pillar roadway with chain arm sawing

    • 摘要: 在大同矿区“三硬”煤层条件下,随着浅部煤炭资源的日益枯竭,采矿活动不断走向深地,地应力逐渐增大,塔山煤矿8311工作面和8312工作面间仅留设6 m小煤柱,2312巷会遭受两工作面的重复采动,为保证两工作面重复采动影响下巷道的围岩稳定性,同时保证煤炭采出率,采用同煤集团自行研发的链臂锯进行机械切顶, 以达到顶板弱化效果。为研究该技术使用条件下留巷在两工作面回采期间受重复应力扰动下围岩稳定性,运用数值模拟、力学分析等手段对切顶及未切顶后的巷道围岩应力及变形分布规律等进行研究。研究结果表明:链臂锯切顶卸压能有效切断基本顶间的应力传递,使留巷内顶底板应力峰值下降,应力分布均匀,小煤柱内应力集中峰值大幅降低,提高了留巷围岩稳定性;同时针对小煤柱留巷实体煤侧仍会受超前应力和侧向应力影响形成叠加应力集中区域及小煤柱产生的塑形变形等问题,本文相应提出了改进意见。

       

      Abstract: Under the condition of "three hard" coal seam in Datong mining area, with the gradual depletion of shallow coal resources, mining activities continue to go deep, and the ground stress gradually increases.Only 6 m small coal pillar is left between 8311 working face and 8312 working face in Tashan coal mine, and 2312 roadway will suffer repeated mining of the two working faces.In order to ensure the stability of surrounding rock under the influence of repeated mining of the two working faces, this premise is put forward At the same time, to ensure the coal recovery rate, the chain arm sawing developed by Tongmei group is used for mechanical roof cutting to achieve the effect of roof weakening.In order to study the stability of surrounding rock under the condition of repeated stress disturbance in two working faces, the distribution of stress and deformation of surrounding rock after roof cutting and no roof cutting is studied by means of numerical simulation and mechanical analysis.The results show that the chain arm sawing roof pressure relief can effectively cut off the stress transfer between the basic roof, reduce the peak stress of roof and floor in the retained roadway, the stress distribution is uniform, and the peak stress concentration in small coal pillar is greatly reduced, which improves the stability of surrounding rock of retained roadway; at the same time, for the small coal pillar retained roadway, the solid coal side will still be affected by the advance stress and lateral stress, forming superimposed stress concentration area and small coal pillar.In this paper, the corresponding improvement suggestions are put forward.

       

    /