李朋伟, 王雁林, 徐友宁. 基于无人机与Photoscan软件的矿山地质环境三维立体建模及应用[J]. 中国矿业, 2021, 30(9): 73-79. DOI: 10.12075/j.issn.1004-4051.2021.09.001
    引用本文: 李朋伟, 王雁林, 徐友宁. 基于无人机与Photoscan软件的矿山地质环境三维立体建模及应用[J]. 中国矿业, 2021, 30(9): 73-79. DOI: 10.12075/j.issn.1004-4051.2021.09.001
    LI Pengwei, WANG Yanlin, XU Youning. 3D modeling and application of mine geological environment based on UAV and Photoscan software[J]. CHINA MINING MAGAZINE, 2021, 30(9): 73-79. DOI: 10.12075/j.issn.1004-4051.2021.09.001
    Citation: LI Pengwei, WANG Yanlin, XU Youning. 3D modeling and application of mine geological environment based on UAV and Photoscan software[J]. CHINA MINING MAGAZINE, 2021, 30(9): 73-79. DOI: 10.12075/j.issn.1004-4051.2021.09.001

    基于无人机与Photoscan软件的矿山地质环境三维立体建模及应用

    3D modeling and application of mine geological environment based on UAV and Photoscan software

    • 摘要: 随着“两山”理论的推行和实践,矿山地质环境防治工作愈发重要,其中无人机三维立体建模技术的应用对矿山地质环境防治工作具有十分重要的推动作用。本文采用小型四旋翼无人机和Photoscan软件建立三维立体模型的技术方法,以宁东能源化工基地羊场湾煤矿的1 km2范围为研究区,定性化、定量化研究了煤矸石堆场、地面沉陷等矿山地质环境问题。基于构建的三维立体模型,计算出煤矸石堆场体积及压占土地面积,地裂缝长度、走向与宽度,地面沉陷面积以及最大沉陷值,测量长度相对误差小于0.5%,面积相对误差小于1%。该方法与传统测量和其他建模技术方法相比,具有低成本、便捷的优势,为矿山地质环境调查评价提供了新的手段,丰富和发展了矿山地质调查技术方法。

       

      Abstract: With the implementation and practice of the “Two Mountains” theory, the prevention and control of mine geological environment is becoming more and more important.The application of 3D modeling technology for drones has a very important role in promoting the prevention and control of mine geological environment.In this paper, a small quadrotor UAV and Photoscan software are used to establish a 3D model.The 1 km2 area of Ningdong energy chemical base Yangchangwan coal mine is used as the research area.The gangue storage yard and ground subsidence which mine geological environment issues are qualitatively and quantitatively studied.Based on the constructed 3D model, the volume and area of the coal gangue storage yard, the ground crack length, strike and width, the ground subsidence area and the maximum subsidence value are calculated.The relative error of the measured length is less than 0.5%, and the relative error of the area is less than 1%.Compared with traditional surveying and other modeling techniques, this method has the advantages of low cost and convenience.It provides new methods for the survey and evaluation of mine geological environment, and enriches and develops the technical methods of mine geological survey.

       

    /

    返回文章
    返回