    综放工作面护巷煤柱的留设研究与控制技术

    Research and control technology of coal pillar in roadway protection of fully mechanized caving face

    • 摘要: 针对综放工作面厚煤层护巷煤柱过大,造成煤炭资源浪费等问题,本文以串草圪旦煤矿6102工作面为工程背景,结合运用理论分析、数值模拟与现场试验等方法,分析了不同宽度的护巷煤柱应力及弹塑性区的分布规律。研究结果表明:①掘巷期间,随着护巷煤柱宽度的增大,6103工作面采空区侧的应力分布基本无明显变化,而6102工作面辅运巷道侧的应力分布呈降低趋势,护巷煤柱中部应力叠加现象也呈降低趋势;②当护巷煤柱宽度大于15 m时,护巷煤柱两侧的塑性区范围基本无明显变化,护巷煤柱内的弹性区宽度随着护巷煤柱宽度的增大而增大;③回采期间,留设的护巷煤柱宽度大于14 m时,回采工作面附近的护巷煤柱存在弹性区,综合考虑合理的护巷煤柱的宽度为14 m。现场实践证明巷道围岩得到了很好的控制。

       

      Abstract: In view of the problem that the coal pillar of roadway protection in thick coal seam of fully mechanized top coal caving face is too large, resulting in the waste of coal resources, this paper takes the 6102 working face of Chuancaogedan Coal Mine as the engineering background, combined with the methods of theoretical analysis, numerical simulation and field test, and to analyze the stress of coal pillar of roadway protection with different widths and the distribution law of elastic-plastic zone.The results show that during roadway excavation, with the increase of roadway coal pillar width, the stress distribution on the goaf side of working face 6103 basically does not change significantly, while the stress distribution on the side of auxiliary transportation roadway of working face 6102 show a downward trend, and the stress superposition phenomenon in the middle of roadway coal pillar also show a downward trend.When the width of the roadway coal pillar is greater than 15 m, the plastic zone on both sides of the roadway coal pillar basically does not change significantly, and the width of the elastic zone in the roadway coal pillar increases with the increase of the width of the roadway coal pillar.During mining, when the width of the reserved roadway pillar is greater than 14 m, there is an elastic zone in the roadway coal pillar near the mining face.Considering comprehensively, the reasonable roadway coal pillar width is 14 m.Field practice has proved that the surrounding rock of the roadway has been well controlled.

       

    /