柴玉卿, 郑双飞, 李旭, 杜战军, 李帅, 刘雪, 丁心香. 高填方工程工后沉降演化规律研究综述[J]. 中国矿业, 2022, 31(9): 179-188. DOI: 10.12075/j.issn.1004-4051.2022.09.012
    引用本文: 柴玉卿, 郑双飞, 李旭, 杜战军, 李帅, 刘雪, 丁心香. 高填方工程工后沉降演化规律研究综述[J]. 中国矿业, 2022, 31(9): 179-188. DOI: 10.12075/j.issn.1004-4051.2022.09.012
    CHAI Yuqing, ZHENG Shuangfei, LI Xu, DU Zhanjun, LI Shuai, LIU Xue, DING Xinxiang. Summary of research on post-construction settlement evolution of high fill engineering[J]. CHINA MINING MAGAZINE, 2022, 31(9): 179-188. DOI: 10.12075/j.issn.1004-4051.2022.09.012
    Citation: CHAI Yuqing, ZHENG Shuangfei, LI Xu, DU Zhanjun, LI Shuai, LIU Xue, DING Xinxiang. Summary of research on post-construction settlement evolution of high fill engineering[J]. CHINA MINING MAGAZINE, 2022, 31(9): 179-188. DOI: 10.12075/j.issn.1004-4051.2022.09.012

    高填方工程工后沉降演化规律研究综述

    Summary of research on post-construction settlement evolution of high fill engineering

    • 摘要: 丘陵沟壑地区的高速公路、机场、土石坝在进行建设时常采用高填方工程,高填方工程存在工后沉降难以计算、预测和控制等问题。本文系统调研了现有的高填方工程案例,通过查阅不同工程概况下的高填方工程相关文献与现行规范,总结了高填方工程的工后沉降控制标准,分析了填方高度、土体类型两个主控因素对工后沉降规律的影响,发现粗粒土和细粒土的工后沉降机理、规律存在很大差异。基于两种不同类型土体的高填方工程,简要阐明了产生工后沉降的机理与诱因,分析了两者工后沉降变形规律与主控因素的差异,总结了细粒土的计算理论模型与粗粒土的估算经验模型,以及其他常用的高填方工程工后沉降预测模型。从提高原软土地基承载力、增强填料本身强度、增设防排水措施三方面列举了目前工程中常用的工后沉降防治措施。本文的研究结果可为高填方工程的工后沉降预测与控制措施提供参考。

       

      Abstract: The construction of highways, airports and earth-rock dams in hilly and gully areas often occurs with high fill engineering.The post-construction settlement is difficult to calculate, predict and control in high fill engineering.This paper systematically investigates the existing high-fill engineering cases and research literature, and summarizes the post-construction settlement control standards for high fill engineering, analyzes the influence of the two main control factors of fill height and soil type on the post-construction settlement law, and finds there are big difference about the post-construction settlement mechanism and law of coarse-grained soil and fine-grained soil.Based on the high fill engineering of two different types of soil, the mechanism and inducement of post-construction settlement are briefly explained, the difference between the two post-construction settlement deformation laws and the main controlling factors are analyzed, and the calculation theory model of fine-grained soil is summarized.Including estimated empirical model with coarse-grained soil, as well as other commonly used post-construction settlement prediction models for high fill engineering.The post-construction settlement prevention measures commonly used in current projects are listed from three aspects:improving the bearing capacity of the original soft soil foundation, enhancing the strength of the filler itself, and adding prevention and drainage measures.The research conclusions of this paper can provide reference for post-construction settlement prediction and control measures of high fill engineering.

       

    /