盛建华, 宋海东. 焦家金矿矿产资源快速整合中的困难与措施探讨[J]. 中国矿业, 2023, 32(3): 34-40. DOI: 10.12075/j.issn.1004-4051.2023.03.005
    引用本文: 盛建华, 宋海东. 焦家金矿矿产资源快速整合中的困难与措施探讨[J]. 中国矿业, 2023, 32(3): 34-40. DOI: 10.12075/j.issn.1004-4051.2023.03.005
    SHENG Jianhua, SONG Haidong. Discussion on difficulties and measures in rapid integration of mineral resources in Jiaojia Gold Mine[J]. CHINA MINING MAGAZINE, 2023, 32(3): 34-40. DOI: 10.12075/j.issn.1004-4051.2023.03.005
    Citation: SHENG Jianhua, SONG Haidong. Discussion on difficulties and measures in rapid integration of mineral resources in Jiaojia Gold Mine[J]. CHINA MINING MAGAZINE, 2023, 32(3): 34-40. DOI: 10.12075/j.issn.1004-4051.2023.03.005

    焦家金矿矿产资源快速整合中的困难与措施探讨

    Discussion on difficulties and measures in rapid integration of mineral resources in Jiaojia Gold Mine

    • 摘要: 焦家金矿是焦家金成矿带众多金矿中比较重要的矿山,也是山东黄金集团有限公司下属的核心骨干生产矿山,经过四十余年的开采,资源紧张的形势日趋严重。2021年4月,焦家金矿借助烟台市金矿集中整治整合机遇,启动金矿整合程序。焦家金矿整合区由山东黄金集团有限公司下属的8个采矿权、5个探矿权和莱州金辉矿业有限公司下属的1个采矿权构成,整合工作面临诸多现实困难。整合工作由省市县三级政府靠前指挥调度,由过去的宏观调控指导调整为主导服务、挂牌作战、亲力亲为,山东黄金集团有限公司市场化运作,主动配合。 随着整合区块采矿许可证的颁发,焦家金矿提前实现了原计划五年之内完成的矿产资源整合目标,做到了当年整合、当年取证,为后续金矿整合工作做出了重要示范,提供了成功样本。

       

      Abstract: Jiaojia Gold Mine is one of the most important gold mines in Jiaojia Gold metallogenic belt, and it is also the core production mine subordinate to Shandong Gold Group Co., Ltd.After more than forty years of mining, the situation of resource shortage is becoming increasingly serious.In April 2021, Jiaojia Gold Mine started the gold mine integration process with the rare opportunity of centralized consolidation and integration of gold mine in Yantai City.Jiaojia Gold Mine integration area is composed of eight mining rights and five exploration rights subordinate to Shandong Gold Group Co., Ltd.and one mining right subordinate to Laizhou Jinhui Mining Co., Ltd.The integration work is faced with many practical difficulties.The integration work is directed and dispatched by the provincial, municipal and county governments at the top level, and adjusted from the past macro-control guidance to the leading service, listing and fighting, and hands-on operation.Shandong Gold Group Co., Ltd.operates in the market and actively coordinates.With the issuance of the mining license of the integrated block, the goal of mineral resources integration that is originally planned to be completed within five years is realized.The integration and evidence collection in the same year are achieved, which made an important demonstration and provided a successful sample for the subsequent gold mine integration work.

       

    /