刘国昊, 崔育菘, 姜立华, 张思佳, 许卫江, 宋蕴航. 辽宁省国家级绿色矿山建设现状及发展对策研究[J]. 中国矿业, 2023, 32(S1): 44-47. DOI: 10.12075/j.issn.1004-4051.20230308
    引用本文: 刘国昊, 崔育菘, 姜立华, 张思佳, 许卫江, 宋蕴航. 辽宁省国家级绿色矿山建设现状及发展对策研究[J]. 中国矿业, 2023, 32(S1): 44-47. DOI: 10.12075/j.issn.1004-4051.20230308
    LIU Guohao, CUI Yusong, JIANG Lihua, ZHANG Sijia, XU Weijiang, SONG Yunhang. Construction status and development countermeasures research of national green mine construction in Liaoning Province[J]. CHINA MINING MAGAZINE, 2023, 32(S1): 44-47. DOI: 10.12075/j.issn.1004-4051.20230308
    Citation: LIU Guohao, CUI Yusong, JIANG Lihua, ZHANG Sijia, XU Weijiang, SONG Yunhang. Construction status and development countermeasures research of national green mine construction in Liaoning Province[J]. CHINA MINING MAGAZINE, 2023, 32(S1): 44-47. DOI: 10.12075/j.issn.1004-4051.20230308

    辽宁省国家级绿色矿山建设现状及发展对策研究

    Construction status and development countermeasures research of national green mine construction in Liaoning Province

    • 摘要: 辽宁省是矿产资源大省,绿色矿山建设工作起步较早,目前全省共有国家级绿色矿山54家,居全国第11位,绿色矿山建设成果显著,但存在重点地区创建工作不突出、重点矿种创建不及时、中小型矿山创建不积极等问题。基于此,对辽宁省国家级绿色矿山建设亮点和存在的主要问题进行梳理,并对建设水平不均衡、工作合力未形成、政策措施不到位、企业创建积极性不高等问题深入研究,抓住绿色矿山创建重点工作内容。建议下一步在出台差别化约束政策、建立绩效考核制度、开展联合监管及宣传等方面开展工作。

       

      Abstract: As a province with abundant mineral resources, green mining work began earlier in Liaoning Province.So far, there are 54 national level green mines, ranking 11th in the country.Although the construction of green mines has achieved significant results, there are still many problems, such as the lack of outstanding creation work in key areas, untimely creation of key mineral types, and the lack of active creation of small and medium-sized mines.The highlights and main problems of national level green mine construction will be sorted out, and in-depth research and countermeasures will be conducted to address the issues of uneven construction level, lack of joint efforts, inadequate policy measures, and low enthusiasm for enterprise creation, focusing on the key work content of green mine creation.It is suggested that the next step will be to implement differentiated constraint policies, establish performance evaluation systems, and carry out joint supervision and publicity.

       

    /

    返回文章
    返回