Abstract:
The railway subgrade compaction indexs of foundation coefficient K
30,dynamic elastic modulus
Evd,the second rebound modulus
EV2, the second resilient modulus and a second resilient modulus
EV2 /
EV1,light dynamic penetrationN10,and moisture content w were obtained by field test in SHU-HUANG railroad.Based on the above datas,The changing relationship of foundation compaction indexes —
K30,
Evd,
EV2,
EV2/
EV1,
N10,and moisture content w separately were researched.The mentioned estimation methods in
K30,
EV2,
EV2/
EV1,
Evd being estimated by use of N
10 were proposed.The applicable conditions of estimation method was obtained through examples verification:① the silty clay as main filler was belong to c group,the moisture content being 8%~14%;②
N10 range was 17~30,and
EV2/
EV1 was estimated to fix error.The results were shown:The method proposed was great importance,for the existing heavy rail roadbed filler Group
C rapid detection and evaluation.