CHEN Min, MENG Gang, MIAO Qi, CHEN Xue, WANG Tianyuan, QU Junli. Thoughts on management of overlaid mineral resources by construction projects in the new era[J]. CHINA MINING MAGAZINE, 2022, 31(9): 24-30. DOI: 10.12075/j.issn.1004-4051.2022.09.009
    Citation: CHEN Min, MENG Gang, MIAO Qi, CHEN Xue, WANG Tianyuan, QU Junli. Thoughts on management of overlaid mineral resources by construction projects in the new era[J]. CHINA MINING MAGAZINE, 2022, 31(9): 24-30. DOI: 10.12075/j.issn.1004-4051.2022.09.009

    Thoughts on management of overlaid mineral resources by construction projects in the new era

    • The management of overlaid mineral resources by construction projects is an administrative function to rationally protect mineral resources and ensure the smooth development of construction projects. Based on combing the new situation and new requirements faced by the overlaying management, such as perfecting the compensation system of natural resources owned by the whole people, the paper systematically summarized the current situation and main problems of the current overlaying management system, including the current system construction situation with the Notice of Ministry of Land and Resources on Further Doing a Good Job in the approval and Management of Important Mineral Resources Overlaid by Construction Projects as the programmatic document, the current situation of management requirements such as overlaid approval not used as a precondition for land pre-trial management or land use approval management, the system implementation situation such as lots of difficulties on the signing of overlaying compensation agreement, and the current main problems such as unestablished compensation system of overlaid mineral resources, insufficient function display of overlaying management on protecting mineral resources from being overlaid, unclear overlaying compensation standard, and incomplete management content. In view of the problems, from the perspective of earnestly safeguarding the legitimate rights and interests of national owners and users of mineral resources, enhancing the operability of the system, strengthening the supervision during and after the event, and improving the management efficiency, this paper put forward some policy suggestions, including establishing and perfecting the compensation system of overlaid mineral resources, adjusting the approval procedure and functional department of overlaying management, refining and supplementing the management contents of overlaying compensation, and supplementing and perfecting the overlaying management system, looking forward to providing reference for optimizing the management of overlaid mineral resources by construction projects in China.

    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return