JIANG Shenglin,WANG Bailu. Application and analysis of the skip in the vertical shaft developmentJ. China Mining Magazine,2025,34(S2):588-592. DOI: 10.12075/j.issn.1004-4051.20252024
    Citation: JIANG Shenglin,WANG Bailu. Application and analysis of the skip in the vertical shaft developmentJ. China Mining Magazine,2025,34(S2):588-592. DOI: 10.12075/j.issn.1004-4051.20252024

    Application and analysis of the skip in the vertical shaft development

    • Based on the underground mining of depth ore body with small scale, according to the vertical shaft development system, this paper verifies the optimal solution of the selected scheme by comparing different schemes of multi-rope flip skip and single-rope flip skip, makes in-depth comparison from two aspects of comparable investment and economical analysis,the multi-rope scheme is verified the better one. Analyze and study the most unfavorable operating conditions of the flipping skip system during operation, point out the disadvantages of the selected scheme, the use of heavy (balance) tail rope method to solve the slippage problem is proposed, and conduct reliability analysis, as well as the energy-saving advantages in the heavy tail rope system.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return