LIU Shuangxing, WENG Yibin, YANG Shugang, CAI Mingyu, ZHANG Kunfeng, WU Jian. Environmental integrity regulation of CCUS projects in China: logic, key technologies and optimizationJ. CHINA MINING MAGAZINE. DOI: 10.12075/j.issn.1004-4051.20260558
    Citation: LIU Shuangxing, WENG Yibin, YANG Shugang, CAI Mingyu, ZHANG Kunfeng, WU Jian. Environmental integrity regulation of CCUS projects in China: logic, key technologies and optimizationJ. CHINA MINING MAGAZINE. DOI: 10.12075/j.issn.1004-4051.20260558

    Environmental integrity regulation of CCUS projects in China: logic, key technologies and optimization

    • Pressure propagation and plume migration of CO2 geological storage may continue after injection ceases, while emission-reduction claims require continuous and traceable evidence. This study examines why environmental integrity regulation must span the full lifecycle of carbon capture, utilization and storage(CCUS) projects in China and how technical judgments can be linked to existing institutions. Policy-text analysis, synthesis of representative projects and institutional comparison are used to relate containment, environmental safety and verifiability to site appraisal, pilot injection, full-scale operation, closure and long-term responsibility. China has gained experience in site characterization, injection control, well integrity and multi-media monitoring, but front-end appraisal and checklist-style requirements are insufficiently connected to model reassessment during operation, anomaly response and post-injection stability evaluation. A site-specific decision scale can combine the natural variability of environmental baselines, calibrated model prediction envelopes, engineered pressure and well-integrity limits, and the potential consequences for receptors. Isolated suspect deviations, persistent or convergent deviations, and confirmed leakage or loss of a control boundary warrant, respectively, verification, operational restraint and emergency response. The outcomes should feed back into models, areas of review and monitoring plans. Therefore, environmental integrity cannot be demonstrated by a fixed monitoring list or a uniform post-injection period. Within existing statutory responsibilities, shared site data, lifecycle technical reassessment and coordinated review can connect space-use questions, environmental risk and emission-reduction verification. Any dedicated permit or transfer-of-responsibility scheme requires a clear legal basis and convergent evidence of long-term stability.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return