Advanced pre pumping and while drawing-off and smoke in tunneling of application
-
-
Abstract
the advance beforehand, while drawing-off and smoke extraction roadway excavation is in the same time, to influence of coal in the wall to expand fissure depth within the scope and roadway surrounding roof-floor coal body of gas during drainage. The application of the technology can effectively solve the roadway excavation in the process of abnormal gas emission problems, ensure the safety in production.
-
-