COMPREHENSIVE CONTROL AND CAPACITY-RAISING RECONSTRUCTION OF LANTING TAILING POND
-
Abstract
This paper introdnces the comprehensive control ways for a hazardous tailing pond. Based on the all-round surveying and analysing the pond, and teken the measures such as drainage of va-dose water from dam body, re forcing the drainage facility, building the subdam and constructing the 3rd-stage flood drainage facility,the safe exploitation of the Lanting Tailing Pond was ensured to meet the mine life and 7O% of perspective resource.
-
-