Wang Weicui. COMPREHENSIVE CONTROL AND CAPACITY-RAISING RECONSTRUCTION OF LANTING TAILING PONDJ. CHINA MINING MAGAZINE, 1994, 3(4): 36-38.
    Citation: Wang Weicui. COMPREHENSIVE CONTROL AND CAPACITY-RAISING RECONSTRUCTION OF LANTING TAILING PONDJ. CHINA MINING MAGAZINE, 1994, 3(4): 36-38.

    COMPREHENSIVE CONTROL AND CAPACITY-RAISING RECONSTRUCTION OF LANTING TAILING POND

    • This paper introdnces the comprehensive control ways for a hazardous tailing pond. Based on the all-round surveying and analysing the pond, and teken the measures such as drainage of va-dose water from dam body, re forcing the drainage facility, building the subdam and constructing the 3rd-stage flood drainage facility,the safe exploitation of the Lanting Tailing Pond was ensured to meet the mine life and 7O% of perspective resource.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return