YANG Junpeng, DAI Huayang, ZHANG Jianwei. The problems and solution of the construction of green mine in the new normal[J]. CHINA MINING MAGAZINE, 2017, 26(1): 67-71.
    Citation: YANG Junpeng, DAI Huayang, ZHANG Jianwei. The problems and solution of the construction of green mine in the new normal[J]. CHINA MINING MAGAZINE, 2017, 26(1): 67-71.

    The problems and solution of the construction of green mine in the new normal

    • This paper analyses the influences on development of the mining in the process of the changing and adjustment in economy, politics, society and environment, which suggests that constructing green mine and developing green mining is the only way to solve the problems in Chinese mining. At present, there are a lot of problems in the construction of green mine in China, such as a little green mines, an imperfect standard, imprecision supporting regulation, less coordinated between management departments and so forth. This paper put forward to solve the above problems: laying down perfect national green mine standard system; continuing to push the establishment of green mines; making the financial and taxation policies that support the construction of green mine.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return