CHEN Yu-min, LI Guo-qing, HE Ji-ping, HU Nai-lian. Construction and practice of digital mine for Shandong gold groupJ. CHINA MINING MAGAZINE, 2011, 20(3): 10-14.
    Citation: CHEN Yu-min, LI Guo-qing, HE Ji-ping, HU Nai-lian. Construction and practice of digital mine for Shandong gold groupJ. CHINA MINING MAGAZINE, 2011, 20(3): 10-14.

    Construction and practice of digital mine for Shandong gold group

    • Both of the background and the logical framework for Shandong Gold Group to carry out digital mine were introduces, based on that the construction contents of digital mine were discussed. Several contents were integrated during the construction including the built up of basic platform, the 3D visualization of geological resources based on mining software, the realization of production automation, the establishment of integrated safety monitoring and management system, the developments of the interoperable operation management system, and the application of generalized information service system. The construction results and applying effects were summarized, so that the experiences and strategies can be taken as references for the construction of digital mines in underground metal mines.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return