SUN Zhi-yong, GUO Xiang-ping, YAN Li-xin. The cement grouting reinforcement technique onworking face with large mining height in the end of mining stage in sihe mine tocontrolslide and roof fallJ. CHINA MINING MAGAZINE, 2013, 22(9): 111-114.
    Citation: SUN Zhi-yong, GUO Xiang-ping, YAN Li-xin. The cement grouting reinforcement technique onworking face with large mining height in the end of mining stage in sihe mine tocontrolslide and roof fallJ. CHINA MINING MAGAZINE, 2013, 22(9): 111-114.

    The cement grouting reinforcement technique onworking face with large mining height in the end of mining stage in sihe mine tocontrolslide and roof fall

    • By using 6.2meter full-seam mining technology in SiHemine,working face with large height in the end of mining stage(less than 150meters)will prone to happen slide and roof falling.In order to solve the technical problem,the cement grouting reinforement prevention and control technology were adopted on the basis of detailed analysis of rock structure.Taking the construction technology of combination of 6mshallow-hole plugging grouting and 12mdeep-hole high pressure grouting,we achieved smooth progress and safety in production of working face.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return