CAVING OF NO. S6 LEVEL-PILLAR FOR INSULATING MINED-OUT AREA IN SHOUWANGFEN COPPER MINE
-
Abstract
With respect to the stability of level-pillar changed, the treatment of Shouwangfen CopperMine's No. S6 mined-out area, which had been decided to insulate the area with level-pillar, also changed intocaving the leval pillar as the mineral base. The design and putting into practice are indicated emphatically.
-
-