3-D FEM ANALYSIS ON THE OPTIMIZATION OF MINING PROJECTS OF GUJIATAI ORE AREA IN LAIWU IRON MINE
-
Abstract
In this paper, the various construction projects underground excavation and filling in Gujiatai Ore Area are computed by 3-D FEM. The extracting room sizes and construction sequence are optimized. Some meaningful conclusions are gained and some reasonable suggestions are proposed.
-
-