Jiang Weidong, Zhang Chunsheng, Li Xibing. REVIEW OF THEORETICAL STUDY AND ENGINEERING PRACTICE OF TAILINGS DAM CONSTRUCTED WITH UPSTREAM METHOD IN CHINAJ. CHINA MINING MAGAZINE, 2003, 12(8): 54-57.
    Citation: Jiang Weidong, Zhang Chunsheng, Li Xibing. REVIEW OF THEORETICAL STUDY AND ENGINEERING PRACTICE OF TAILINGS DAM CONSTRUCTED WITH UPSTREAM METHOD IN CHINAJ. CHINA MINING MAGAZINE, 2003, 12(8): 54-57.

    REVIEW OF THEORETICAL STUDY AND ENGINEERING PRACTICE OF TAILINGS DAM CONSTRUCTED WITH UPSTREAM METHOD IN CHINA

    • The safety of tailings dam constucted with upstream method(TDM),which is main style of tailings dam in China,is very important.In this paper,theoretical study and engineering practice of TDM,including dam construction,seepage,drainage,seismic response,management,monitoring,and environmental impact,is reviewed.As an emphases,the study result of Dashihe Tailings Dam is introduced.Finally,the future study based on seepage is discussed as the remarks.These contents may have reference to design and management of TDM during the middle and latter periods.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return