LI Mei. Feasibility study report of 4Mt/a coal prepare plant belonged to Tengchong mining Co.,Ltd.J. CHINA MINING MAGAZINE, 2008, 17(10): 102-105,108.
    Citation: LI Mei. Feasibility study report of 4Mt/a coal prepare plant belonged to Tengchong mining Co.,Ltd.J. CHINA MINING MAGAZINE, 2008, 17(10): 102-105,108.

    Feasibility study report of 4Mt/a coal prepare plant belonged to Tengchong mining Co.,Ltd.

    • In the face of resource shortage, Tengchong mining Co., Ltd enters on importing coal from Mongolia in order to satisfy the great domestic demand in coal. They will build another 4Mt/a coal prepare plant, and the feasibility study report was brought forward to.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return