Zhao Qinghua, Liu Zhenyao, Yan Guodong. ANALYSIS AND CONTROL TO THE PREMATURE EXPLOSION FAULT OF ELECTRICAL INITIATION NETWORK IN METALLURGICAL MINESJ. CHINA MINING MAGAZINE, 2005, 14(4): 55-58.
    Citation: Zhao Qinghua, Liu Zhenyao, Yan Guodong. ANALYSIS AND CONTROL TO THE PREMATURE EXPLOSION FAULT OF ELECTRICAL INITIATION NETWORK IN METALLURGICAL MINESJ. CHINA MINING MAGAZINE, 2005, 14(4): 55-58.

    ANALYSIS AND CONTROL TO THE PREMATURE EXPLOSION FAULT OF ELECTRICAL INITIATION NETWORK IN METALLURGICAL MINES

    • Through the analysis on the case of premature explosion in electrical initiation network, the author put forward a series of ways to control premature explosion by means of "Fault Tree Analysis", provided a scientific basis for explosion design, construction and explosion management.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return