Zhang Shuntang, Yan Xuqian. LARGE-SCALE MINE ENTERPRISE EQUIPMENT PROPERTY MANAGEMENT SYSTEM RESEARCHJ. CHINA MINING MAGAZINE, 2006, 15(5): 17-21.
    Citation: Zhang Shuntang, Yan Xuqian. LARGE-SCALE MINE ENTERPRISE EQUIPMENT PROPERTY MANAGEMENT SYSTEM RESEARCHJ. CHINA MINING MAGAZINE, 2006, 15(5): 17-21.

    LARGE-SCALE MINE ENTERPRISE EQUIPMENT PROPERTY MANAGEMENT SYSTEM RESEARCH

    • This article in analyzes the large-scale mine equipment property management (EAM) the present situation,the existence question, creates the reason in the foundation, proposed the introduction or the establishment mine EAM system necessity,and has produced the mine enterprise EAM system basic function frame.Take Jiaodong some large-scale gold mine as the example,has analyzed the established property management service process,has established the EAM system development 8 functions module, comprehensively has realized the equipment and the spare parts which until discards controls the integrated operation from the entire process management.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return