Zhang Shenghua, Li Xingde. TEST OF OPEN MINING WITH SUBSEQUENT FILLING BY CEMENTING TAILINGS IN BAIYN CO.'S COPPER MINEJ. CHINA MINING MAGAZINE, 1997, 6(4): 34-38.
    Citation: Zhang Shenghua, Li Xingde. TEST OF OPEN MINING WITH SUBSEQUENT FILLING BY CEMENTING TAILINGS IN BAIYN CO.'S COPPER MINEJ. CHINA MINING MAGAZINE, 1997, 6(4): 34-38.

    TEST OF OPEN MINING WITH SUBSEQUENT FILLING BY CEMENTING TAILINGS IN BAIYN CO.'S COPPER MINE

    • This paper introduces the some ground pressure control measures and successful experiencesand effects of using the new infiltration cable-net soft retaining wall during test of" open mining with sub-sequent filling by cementing tailings.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return