Zhang Shenghua, Li Xingde. TEST OF OPEN MINING WITH SUBSEQUENT FILLING BY CEMENTING TAILINGS IN BAIYN CO.'S COPPER MINEJ. CHINA MINING MAGAZINE, 1997, 6(4): 34-38.
Citation:
Zhang Shenghua, Li Xingde. TEST OF OPEN MINING WITH SUBSEQUENT FILLING BY CEMENTING TAILINGS IN BAIYN CO.'S COPPER MINEJ. CHINA MINING MAGAZINE, 1997, 6(4): 34-38.
Zhang Shenghua, Li Xingde. TEST OF OPEN MINING WITH SUBSEQUENT FILLING BY CEMENTING TAILINGS IN BAIYN CO.'S COPPER MINEJ. CHINA MINING MAGAZINE, 1997, 6(4): 34-38.
Citation:
Zhang Shenghua, Li Xingde. TEST OF OPEN MINING WITH SUBSEQUENT FILLING BY CEMENTING TAILINGS IN BAIYN CO.'S COPPER MINEJ. CHINA MINING MAGAZINE, 1997, 6(4): 34-38.
TEST OF OPEN MINING WITH SUBSEQUENT FILLING BY CEMENTING TAILINGS IN BAIYN CO.'S COPPER MINE
This paper introduces the some ground pressure control measures and successful experiencesand effects of using the new infiltration cable-net soft retaining wall during test of" open mining with sub-sequent filling by cementing tailings.