TAN Jun-qing, SHEN Cui-liang. Construction practices for ore slurry pipeline of Baiyunebo iron mine,Baotou iron and steel companyJ. CHINA MINING MAGAZINE, 2011, 20(11): 106-110.
    Citation: TAN Jun-qing, SHEN Cui-liang. Construction practices for ore slurry pipeline of Baiyunebo iron mine,Baotou iron and steel companyJ. CHINA MINING MAGAZINE, 2011, 20(11): 106-110.

    Construction practices for ore slurry pipeline of Baiyunebo iron mine,Baotou iron and steel company

    • As the third iron concentrate slurry pipeline interiorly, the largest ore slurry pipeline system and include the longest water pipeline with one pump station in China, Bayan Obo slurry pipeline engineering of Baotou has been operated. It can transport 5.5 million tons of iron concentrate and 20 million m3 water per year. In order to overcome freezing temperatures and rugged terrain,many technical problems have been resolved in the period of construction.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return