ON COMBINED SHRINKAGE AND STOPING-AND-FILLING METHOD WITH DIRECT-ROUTE FLUSHING SHIELD ITS APPLICATION IN HIGH-DIPPING AND VERY THIN GOLD VEIN MINING
-
Abstract
Through a case study for a typical mine, the paper describes the application of combined shrinkage and stopping-and-filling method with direct-route flushing shield for high-dipping and very thin gold vein mining and presents the evolution, evalution and features of the mining method.
-
-