FILLING & WATER SEALING CONSTRUCTION OF THE SIDE WALL FOOT OF THE DRILLING OF LONGYUAN SHAFT
-
Abstract
According to the Special featnres of the shaft wall rocks and its watering:it is suggested to put shaft watering under control,with the advanced Slertyinpouring technigue,and thus to ensure the guality of the construction,to enhance the Stability of the Shaft.
-
-