Li Mingwen. APPLICATION OF CAD IN PRODUCTION SCHEDULING AT WAITOUSHAN IRON MINEJ. CHINA MINING MAGAZINE, 2000, 9(2): 59-62.
    Citation: Li Mingwen. APPLICATION OF CAD IN PRODUCTION SCHEDULING AT WAITOUSHAN IRON MINEJ. CHINA MINING MAGAZINE, 2000, 9(2): 59-62.

    APPLICATION OF CAD IN PRODUCTION SCHEDULING AT WAITOUSHAN IRON MINE

    • In this paper,the special characteristics of geology-survey-mining system of Waitoushan Iron Mine better than other systems are described in detail. The design of three-dimension motion picture has been completed on the personal computer.The system has good universality and transplantability.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return