column
    CURRENT STATUS AND EXPLICATION OF PLANNED MINE AREAS BY THE COUNTRY
    Ceng Lan
    1994, 3(4): 8-11.
    Abstract PDF
    A STRATEGY OF CHINA'S ENERGY RESOURCES DEVELOPING
    Cao Yiran
    1994, 3(4): 13-17.
    Abstract PDF
    FEATURES OF MINING BY STAGES IN OPEN-PITS
    Liu Tingji
    1994, 3(4): 18-21.
    Abstract PDF
    COMBINED MINING TECHNOLOGY FOR A WEAK-BREAK ORE BODY
    Huo Junfa
    1994, 3(4): 23-25.
    Abstract PDF
    A NEW CONCEPT ON USING SKIP SHAFT FOR AIR RETURNING
    Miao Gang
    1994, 3(4): 26-29.
    Abstract PDF
    DISCUSSION ON FLOTATION MACHINES FOR FINE ORES
    He Tingshu, Chen Bingchen
    1994, 3(4): 31-35.
    Abstract PDF
    COMPREHENSIVE CONTROL AND CAPACITY-RAISING RECONSTRUCTION OF LANTING TAILING POND
    Wang Weicui
    1994, 3(4): 36-38.
    Abstract PDF
    BUILDING,HEIGHTENING AND RECONSTRUCTION OF TAILING DAM BY CENTRE LINE METHOD
    Wang Bochun, Zheng Zhengguang, Li Yuncheng, Yang Panming, Zhang Longwei
    1994, 3(4): 39-42.
    Abstract PDF
    ANALYSIS OF SYSTEM ECONOMY IN EQUIPMENT DESIGNING
    Sun Qiubo
    1994, 3(4): 43-45.
    Abstract PDF
    IMPROVEMENT AND PARAMETER OPTIMIZATION OF DISTANCE POWER INVERSE RATIO METHOD
    Wang Tie, Jin Zhiqiu, Wang Zhihong
    1994, 3(4): 47-50.
    Abstract PDF
    PRACTICE IN STOP-UP LEAKAGE AND ANTI-PERMEANCE BY BOLT-SHOTCRETE-NET COMBINED SUPPORTING IN UNDERGROUND ROOMS
    Xu Qiubao
    1994, 3(4): 65-67.
    Abstract PDF