column
    BGRIMM EMULSION EXPLOSIVE AND ITS APPLICATION IN SURFACE MINE
    Wang Xuguang, Xu Zhizhuang, Zhong Yinting, Wang Guoli
    1999, 8(2): 1-5.
    Abstract PDF
    STATUS QUO AND COUNTERMEASURES OF COMPREHENSIVE UTILIZTATION OF TAILINGS IN CHINA
    Chang Qianfa, Wang Yunmin
    1999, 8(2): 20-23.
    Abstract PDF
    APPLICATION OF SYSTEMS DYNAMICS TO THE SALABLE PRODUCTION FORECAST IN MINERAL INDUSTRY
    Lin Qitai
    1999, 8(2): 24-26.
    Abstract PDF
    PROBE INTO MANAGEMENT PROBLEMS ABOUT COALBED METHANE RESOURCES IN CHINA
    Gao He, Wang Lijie
    1999, 8(2): 27-28.
    Abstract PDF
    VALUATION OF AN EXPLORATION PROPERTY
    Yang Zhengxi
    1999, 8(2): 29-31.
    Abstract PDF
    STUDY ON CUTTING STOPING OF FOOTWALL TRIANGULAR ORE ZONE AT CHENGCHAO IRON MINE
    Kuang Zhongxiang
    1999, 8(2): 32-34.
    Abstract PDF
    NUMERICAL STUDIES OF THE SAFETY FOR THE UNDERGROUND MINING SYSTEM IN XIANGXI GOLD MINE
    Ding Dexin, D.J.Reddish
    1999, 8(2): 35-36.
    Abstract PDF
    PRACTICE ON USING RESUING SHRINKAGE STOPING TO MINE EXTREME NARROW VEIN
    Chen Xishan
    1999, 8(2): 38-39.
    Abstract PDF
    SLOPE STABILITY ANALYSIS OF INNER MONGOLIA′S HUOGEQI OPEN PIT COPPER MINE
    Zhang Fei, Yuan Shaoguo, An Ran
    1999, 8(2): 41-43.
    Abstract PDF
    APPEARANCE AND CONTROL OF GROUND PRESSURE IN SOFT ROCK DRIFTS AT COAL MINE
    Liu Zhangwu, Lu Shiliang
    1999, 8(2): 44-48.
    Abstract PDF
    MODELING PRINCIPLES OF FRACTAL JOINTS
    Wang Qianyuan, Hu Jingshuang
    1999, 8(2): 49-51.
    Abstract PDF
    A PRELIMINARY ANALYSIS OF THE ENVIRONMENTAL ENGINEERING GELOLGY OF FUSHUN WEST OPEN PIT
    Shen Li, Liu Jinghui, Jiang Zhiming
    1999, 8(2): 53-54.
    Abstract PDF
    GENERAL CRITERION AND MIXED ALGORITHMS FOR OPTIMUM DESIGN OF OPEN PIT MINES
    Shi Zhongmin
    1999, 8(2): 55-59.
    Abstract PDF
    M-Intranet-A MODEL OF COMPREHENSIVE INFORMATION PROCESSING IN MINE ENTERPRISE
    Wang Wenming, Song Shouzhi
    1999, 8(2): 60-62.
    Abstract PDF
    A MATHEMATICAL MODEL OF OPTIMAL CONTROL FOR TRUCK DISPATCH SYSTEM IN OPENCAST MINING
    Ma Yifei, Li Xiangyi
    1999, 8(2): 63-65.
    Abstract PDF
    RESEARCH ON SURFACE MODIFICATION OF FINELY GROUND CALCIUM CARBONATE WITH ALUMINATE ACCOMPANIED BY SIMULTANEOUS WET ULTRAFINE GRINDING IN STIRRED MILL
    Ding Hao, Lu Shouci
    1999, 8(2): 67-70.
    Abstract PDF
    APPLICATION OF AUTOMATIC CONTROL IN PRIMARY CLOSED CIRCUIT GRINDING AT GONGCHANGLING ORE DRESSING PLANT
    Liu Yangzhou
    1999, 8(2): 71-73.
    Abstract PDF
    RESEARCH ON GOLD LEACH PROCESSES OF HIGH ARSENIC GOLD ORE
    Liu Shengming
    1999, 8(2): 75-76.
    Abstract PDF
    DEVELOPMENT OF A POLLUTION METEOROLOGY OBSERVATION CONTROL SYSTEM FOR OPEN PIT MINES
    Cai Jinyong, Chen Yuefang, Yang Xin, Lu Guorong, Xiao Zhongqing, Wei Anjiang, Sun Zainan, Wang Hao
    1999, 8(2): 77-79.
    Abstract PDF
    EVELUATION AND PREDICTION OF THE POLLUTION SOURCES OF BAIYUN′EBO IRON MINE
    Wang Zhen, Han Jianhong, Du Jinlian, Zhang Pu, Di Juping
    1999, 8(2): 80-82.
    Abstract PDF
    VENTILATION AND DUST PREVENTION OF BELT-CONVEYOR DECLINE AT OPEN PIT MINE
    Du Cuifeng, Li Huaiyu
    1999, 8(2): 83-84.
    Abstract PDF